Sign In Start Free Trial
Account

Add to playlist

Create a Playlist

Modal Close icon
You need to login to use this feature.
  • Book Overview & Buying Autodesk Civil 3D 2024 from Start to Finish
  • Table Of Contents Toc
  • Feedback & Rating feedback
Autodesk Civil 3D 2024 from Start to Finish

Autodesk Civil 3D 2024 from Start to Finish

By : Stephen Walz, Tony Sabat
4.7 (17)
close
close
Autodesk Civil 3D 2024 from Start to Finish

Autodesk Civil 3D 2024 from Start to Finish

4.7 (17)
By: Stephen Walz, Tony Sabat

Overview of this book

Autodesk Civil 3D can radically increase your civil engineering design and efficiency if you learn to make the most of its features and partner software platforms. Autodesk Civil 3D from Start to Finish will teach you how to leverage its strengths and scale efficiency to large teams. With this book, you’ll uncover all the major features Civil 3D offers, from surface development to intelligent utility design as well as dynamic display work for smart document creation. You’ll learn to configure and manage your civil engineering designs and explore practical applications of tools and modeling techniques available within the software. By the end of this book, you’ll have a thorough understanding of Autodesk Civil 3D along with its partner programs to strategize and improve your future projects.
Table of Contents (21 chapters)
close
close
1
Part 1: Getting Acquainted with Civil 3D and Starting Your Next Project for Success
5
Part 2: Designing and Modeling with Civil 3D from Scratch
11
Part 3: Leveraging Design-Specific Tool Belts
16
Part 4: Advanced Capabilities with Civil 3D

Creating and modifying sanitary sewer pipe networks

As recognized while analyzing elevations and grades at the beginning of our storm drainage gravity utility network design, we realized that we are approximately 25’ below the existing grade along York County Highway at our lowest point within our residential subdivision design.

That said, we will need to use a combination of gravity and pressurized utility networks and find a suitable location for the placement of a required pump station to ensure that we are able to remove wastewater from our site and tie into the existing sanitary sewer network along York Hwy.

With that, let’s go ahead and create a proposed sanitary sewer network using similar steps used to create our GPN - Proposed Storm Drainage gravity utility network earlier in this chapter.

Using the Pipe Network Creation Tools option as done earlier, we’ll create a new sanitary sewer gravity utility network with the following fields applied (also...

Unlock full access

Continue reading for free

A Packt free trial gives you instant online access to our library of over 7000 practical eBooks and videos, constantly updated with the latest in tech
bookmark search playlist font-size

Change the font size

margin-width

Change margin width

day-mode

Change background colour

Close icon Search
Country selected

Close icon Your notes and bookmarks

Delete Bookmark

Modal Close icon
Are you sure you want to delete it?
Cancel
Yes, Delete

Confirmation

Modal Close icon
claim successful

Buy this book with your credits?

Modal Close icon
Are you sure you want to buy this book with one of your credits?
Close
YES, BUY